

The MT 1200M is designed to remain stable and controllable at full operating capacity.
An integrated ballast tank is filled prior to operation, increasing mass and lowering the centre of gravity to counter reaction forces from the monitor. Four support legs allow the trailer to be levelled and secured on site, ensuring safe and stable operation across the full rotation and elevation range.
The chassis and structural design provide a solid operating platform, allowing the monitor to be used with confidence during sustained high-flow operation.
Water inlet connections are angled and positioned for easier handling of large-diameter hoses, supporting practical deployment in real conditions.